The board discussed public outreach and timeline plans for the proposed Seven Acres cemetery expansion to address impending grave shortages. Trustees also received updates on staffing, veteran plot capacity, and restoration work at Cross Street Cemetery.
[Clayton]: All right, we are at 7pm. So I'll get the meeting started. I'll call the meeting to order. And we'll just start as usual with trying to approve our minutes. Did everybody get a chance? Recording in progress? Yeah.
[Unidentified]: Yeah.
[Clayton]: Awesome. All right. Were there any questions or edits that needed to be made? All right. If not, then we can go ahead and make a motion to accept Darlene's wonderful minutes. All right.
[Dee Morris]: Great. Thank you. If there's no
[Clayton]: questions, then we can go straight to a vote all in favor of approving the minutes as written. Aye. Aye. It passes unanimously. They're confirmed. Darlene, thank you again for being so thorough. It's very helpful. It's time for the next one to be able to go through all the details. So thank you. Awesome. So I don't have any, Darlene, you have no record of any visitors wanting to speak, correct? So we can go straight to an old business.
[SPEAKER_01]: Let's see. It says there's six people here.
[Clayton]: One, two, three. There is somebody. Oh, okay. Let me see. I did not see that. Okay. Jennifer Keenan, I see on the screen. Hello, Jennifer. Hello. Hi. Would you like an opportunity to speak at the meeting?
[Community Preservation Manager Theresa Dupont]: I'm good. I'm just here to observe. Thank you.
[Clayton]: Okay. All right. Thank you. Is there anyone else that is on here that would like an opportunity to speak? Let me see. One, two, three, four, five. Who is this? Oh, the sixth is the community media probably.
[Unidentified]: Right.
[Clayton]: Okay. All right. So I think we can get started with old business. Just because I have the floor, I'll just start with mine. So the last time we met, we talked about the fact that myself, and Tim and possibly DJ were gonna have a meeting with the mayor and myself, the mayor and Tim did get to meet together about the seven acres project. And we had a discussion about, you know, what next steps should be, you know, the Mayor wasn't even sure at that time because it's using community funds as well. She wanted to make sure that, you know, like there was community involvement and buy-in that people actually wanted the project to go through. I did let her understand that the intention for the project is not for any aesthetic purposes. It's actually because we're running out of space in the cemetery. You know, she is very sympathetic to, you know, being conscientious about not cutting down a lot of trees and stuff. But we realize that there's a fair amount of education that needs to be communicated, basically, because I think a lot of people don't know that the place that's going to be cleared is mostly what was, you know, has a subfloor already that was the World War II building. Um, that it's not, um, and it's more invasive species that's in that area. It's not like, you know, we're taking out all the trees. It's really, um, I did mention that they're keeping, they're surrounding the seven acres with the, a lot of the older trees that already exist and the ones that they are planning to, um, get rid of for the most part of the ones that are not as viable. and that there's a structure underneath already of those species that are there. And I think with that in mind, I mean, she realized that one of the things is that there's a fair amount of education that needs to happen. And so the rollout that we are thinking of at this point is Tim will prepare, something for the media, so that the community can get to understand what the history of this space is, what the intention for this, this space is to come and, you know, kind of explain, you know, what what's being cleared on the what's not kind of thing so that people have a better sense of what is going on. And he'll get the information to us first so that we can look at the material that's going to be sent out. Then she thinks the council should also get a chance to get that letter and see, you know, what is going on so that they also need to weigh in.
And then in early January, the hope is to do a general press release. and also she would love to have some polling done of the community. I did tell her that the people that we have heard from so far are the people who are against clearing the area, but we haven't really heard because there wasn't a need to kind of thing. We haven't heard from the people who are for the building project. And I did emphasize that if we, you know, we did, we have spent the money to clear the space for this particular purpose because we need the burial space and that the option that we have, we probably have around, I estimated about three years or so left now of space for body burials. And if it's not done, then we basically will run out of space within that time. so that she understood the urgency of the situation and the reason why we're doing it.
So after the press release, we're hoping that that will educate people in the community some. And then I think the communications department will do some sort of polling. I've never been polled in Medford since the time that I've lived here. So I don't know how they decide what parts you know, the community they poll, that's yet to be seen. But then basically that will be the way that the community will be able to participate in the process before she makes her final decision about the funding. So that's where we're at. So I'm not anticipating that we'll get an answer before say February-ish of next year.
And I think also the other complication is there are so many other competing projects that are going on that needs to be funded that she is needing to weigh what is most important to fund this year, this coming year. Any questions on that? More comments? Steve, was I correct in thinking it should be about maybe three years or so of space that we have?
[2kAt0v9zwyw_SPEAKER_00]: It depends. I wouldn't say it'd be any less than that.
[Clayton]: OK. Right. Yeah, because when we started this process, we had about seven years way, way back.
[2kAt0v9zwyw_SPEAKER_00]: And it's actually, that was going to be part of the new businesses. Um, I'm going to have to open up the other singles area and, um, doubles and three grave lots on blueberry, uh, mulberries going to be completely sold out very soon.
[Unidentified]: Yeah.
[Dee Morris]: All right. If it's any help, This coming week, I'll be doing a program at the Senior Center on Brooks Village, which was the post-World War II federally funded housing for veterans and their young families. It was started 1946 and went through to 1954 and then everybody moved out and all of those weren't single-family homes but called barracks were then removed. And that so that might be illuminating.
[Clayton]: Yes, yes. So, you know, maybe you can document that for us so that we can make sure that whatever the press release looks like that Tim has, we make sure that that information is captured. I should contact Tim. Well, I think just basically document it and then we can forward it to him so that he has that to put in the press release. Yeah, just the history, just in case he doesn't have that. It would be great to just document that and send it along so he has that information to share.
[SPEAKER_01]: Okay. Steve, what did you say that you were running out of space on what lane?
[2kAt0v9zwyw_SPEAKER_00]: Mulberry.
[Clayton]: And Steve, how long does it take to open a new?
[2kAt0v9zwyw_SPEAKER_00]: That's already been developed. We just need to open it.
[Clayton]: Oh, okay.
[2kAt0v9zwyw_SPEAKER_00]: So yeah.
[Clayton]: Okay. All right. And is there other, if there's no other question about this particular process that we're going through with, you know, trying to, figure out the steps to start the seven acres project, we can move on. We can table the rest. We don't know anything else until we get this process going so we can move to the next whole business. I don't know, Steve, if you got any updates from anyone about some of the things that we were talking about last time. Well, the fountain got winterized.
[2kAt0v9zwyw_SPEAKER_00]: That ended up happening.
[SPEAKER_01]: Um, let me write that down.
[2kAt0v9zwyw_SPEAKER_00]: And, um, I don't know if you've heard, but, uh, Veronica is no longer working for the city.
[Unidentified]: Oh, yes.
[2kAt0v9zwyw_SPEAKER_00]: Yes.
[Unidentified]: I saw that. Yeah.
[2kAt0v9zwyw_SPEAKER_00]: I think she might be doing a little part-time stuff here. Yeah. It sounds like on Wednesday night, she still has office hours, but that's about it. Okay.
[Unidentified]: All right. No.
[Clayton]: So I know, um, last time we were here, so, uh, sorry, Veronica is going to stay on part time, you think, or eventually I think it's Wednesday nights for only like a couple of hours.
[SPEAKER_01]: Yeah.
[Clayton]: Okay. All right. So there's not going to be a new director of. Oh, there is. Okay. Okay.
[SPEAKER_01]: No, there'll, there'll be, I don't, I don't know when there'll be advertising, but don't know when.
[2kAt0v9zwyw_SPEAKER_00]: Yeah. Okay.
[SPEAKER_01]: All right.
[2kAt0v9zwyw_SPEAKER_00]: Okay, on all business. Hopefully. We'll be hauling that gravel out soon. They're just, I think Fiona is writing up something for that. And once that's out, then we can get started.
[Clayton]: Okay. Okay, thank you. I know last time too, we had Doug at the last meeting and I know we didn't get a chance to. chat about that after that meeting. Was there any follow-up that he did with anybody else? He hasn't spoken to me since then, but I don't know if there's anything that anybody wanted to discuss about what he was asking. Okay. All right. And then who else did we have at the meeting? DJ was there. He gave us the report.
Do you know what the status is? Is there any change in the status? I don't understand the mechanics of the procurement office and what he's doing. Darlene, do you have any updates having to do with DJ and the projects that he's doing? No, I haven't heard anything.
[Clayton]: All right. Yeah, I know that Cross street as well. Did we get a report last time from him? Is cross street all done now, Steve?
[2kAt0v9zwyw_SPEAKER_00]: I probably not completely. I haven't heard from him. I see Teresa's on here and I know they were doing some ground penetrating to see.
[Clayton]: Oh, yes. Okay. I didn't see that Teresa is on. Congratulations, Teresa. We didn't get to say that in person.
[Community Preservation Manager Theresa Dupont]: Hi, Stacy. Hi, everyone. Hi. Can you guys hear me OK, by the way? Yes. Yes, we can. I'm on some AirPods that get a little wonky. So for cross street, Daedalus has been hard at work. I believe that the gate is really the only outstanding piece. I did process the last invoice for the monument restoration over there. So I think he just has a couple little odds and ends just to tighten up, but not fully complete, but I'd say about 95% right now.
[Clayton]: Oh, OK. All right, great. And are they going to just, are they trying to finish the gate this year, or are they planning to just complete that next year, early next year? Sorry, not early, in the spring next year?
[Community Preservation Manager Theresa Dupont]: Tension is this season, and I wish I had a better sense of that timeline. I certainly can find out and circle back with them with the trustees here. Definitely give Steve an update as well. I don't want to misspeak, but I believe the intention is this season and it should be happening shortly. But let me confirm.
[Clayton]: All right. No problem. Thank you. Was there any other old business to you so that you wanted to I'm sorry. Is there anything else that you wanted to speak to today?
[Community Preservation Manager Theresa Dupont]: Nothing else, but just one more thing on cross street if I may. Okay sure. Um Mr. Bergen mentioned we're doing ground penetrating radar and just to kind of expand on that briefly the front lawn section within the walls of cross street cemetery where there's no visible monuments or just to double check what was going on underneath that particular area. We're not certain, so the survey work was just going to help confirm what was subterranean in that section. And that is a report we will certainly share with this body.
[Clayton]: So it hasn't happened yet?
[Community Preservation Manager Theresa Dupont]: The survey work itself is complete. They're just compiling their report and putting together an analysis. We should get that shortly. Again, I will definitely share that with this body.
[Clayton]: Okay. Sounds good. Thank you. Awesome. All right. Um, I thought of one other thing. Oh, I just escaped my mind. Oh, any other words, Steve, on, um, what's happening with the maintenance building slash your.
[2kAt0v9zwyw_SPEAKER_00]: Nothing.
[2kAt0v9zwyw_SPEAKER_00]: Just gagging. They're just getting numbers together for the other building that they want to propose.
[Clayton]: Okay.
[2kAt0v9zwyw_SPEAKER_00]: Other than that, I haven't heard anything.
[Unidentified]: Okay.
[Clayton]: All right. Yeah. I didn't get a lot of emails between the last meeting this month, so I don't have a lot of old business either to report on. How did you make out with the World War II cleaning, the duck poop kind of issue that you had? Did you get anywhere?
[2kAt0v9zwyw_SPEAKER_00]: Once the pool, once the fountain was drained and we washed it down, we got everything, it's all clean.
[Clayton]: OK. And did they come up with a solution for keeping it clean in the future? Like, will you be able to keep the lights on?
[2kAt0v9zwyw_SPEAKER_00]: The lights will be on.
[Clayton]: OK.
[2kAt0v9zwyw_SPEAKER_00]: But there still needs to be a discussion on trying to keep the geese out and what would be the best way to do it. So that still needs to be talked about.
[Clayton]: Okay. All right. And who is, who is the, like, have you figured out who is the best person to talk to about that to kind of get more information on their, uh, how, how to work with geeks?
[2kAt0v9zwyw_SPEAKER_00]: Um, no, I mean, it just, I'd talk with Tim about it, but the whole thing is once we come up with something is, is this going to be a joint effort between us and the veteran's office?
[Clayton]: Oh, okay.
[2kAt0v9zwyw_SPEAKER_00]: Yeah.
[Clayton]: And you probably have to table that until we know who's going to be directing that soon. Yeah. Yeah.
[2kAt0v9zwyw_SPEAKER_00]: But in the meantime, I'm trying to figure out some stuff.
[2kAt0v9zwyw_SPEAKER_00]: All right.
[Clayton]: Any other old business guys that, uh, we need to review anybody got any other updates that I didn't.
[Unidentified]: Yeah.
[Clayton]: Okay.
[Unidentified]: Nope.
[Clayton]: All right. Okay. So then if there, there's nothing more to report, then I will open it up for new business. And Steve, you can have the floor.
[2kAt0v9zwyw_SPEAKER_00]: A couple of things. And now that, you know, Veronica, I'll have to try and touch base with her. She's going to be doing a couple hours, but we just used the last grave on Vietnam that is developed. I can put in a couple, hopefully a couple rows foundations to continue that on. But that leads back to trying to develop that area near the fountain that that we've been talking about to have it, you know, for a multi conflict, you know, not just 1.
So, today meeting, we had a division had meeting and I was talking with Tim and Owen from the engineering and we're going to meet up here and they're going to. you know, we'll talk about what I think we need and then they'll design something and then we'll go from there. But that's another cost item that, you know, better figure out who's going to pay for that too.
[Clayton]: Yeah. So that means Vietnam War veterans would also be able to, to be there, not just anybody, anybody would be able to go over.
[2kAt0v9zwyw_SPEAKER_00]: There was a veteran that qualifies.
[Clayton]: Oh, okay. So I thought that one was going to be,
[2kAt0v9zwyw_SPEAKER_00]: Dedicated to all the other war veterans, you know because everything everything if we run out of space in World War one Korea just say then you know, they need a place for them to go. Yeah, and Like I said, we just used the last one on Vietnam. That was developed. So I got to start looking into Putting pouring another foundation or two.
[Unidentified]: Yeah Okay.
[2kAt0v9zwyw_SPEAKER_00]: Yeah and on another note Mr. Martinetti ended up getting the property next to his mausoleum. I was talking to him yesterday and eventually he is going to build another mausoleum on that property, which it is allowed. But there are a lot of steps that he's going to have to go through and part of it is going to be he needs to submit some plans and this board is going to have to approve them. We're going to need to get the engineering department involved.
Also, the building department, there's a lot of steps to it, but he's not in any hurry, so I'm just putting it out there to let you know that he got the property from the people who previously owned it. He gave me all the paperwork, so everything's up and up. We'll just fill out the proper paperwork and he will be the owner of that property, burial rights.
[Unidentified]: Yes.
[Clayton]: All right. But boy, some meetings we have like, yeah, tons and tons of things going on. And then other meetings, you know, it's just, everything's so quick. Everything is, uh, yeah, going really fast. All right. So, um, did you get all of that Darlene for the minutes?
[SPEAKER_01]: Um, well, I just had a question. Did he, does he already own a mausoleum?
[Unidentified]: Yeah.
[SPEAKER_01]: Oh, and so he's building another one next to it.
[2kAt0v9zwyw_SPEAKER_00]: Yes.
[SPEAKER_01]: Oh, gotcha.
[2kAt0v9zwyw_SPEAKER_00]: Oh, but it's two separate pieces.
[Clayton]: So he bought another mausoleum from somebody else, a piece of property.
[2kAt0v9zwyw_SPEAKER_00]: He, uh, the rights he has to, he has to build it.
[SPEAKER_01]: Oh, well you said plot.
[Clayton]: So when you say property, forgive my ignorance, but if. If what property did he get? Like, you know, it's, it's within the mausoleum space.
[2kAt0v9zwyw_SPEAKER_00]: Somebody already owned the property to build a mausoleum and they never built the mausoleum.
[2kAt0v9zwyw_SPEAKER_00]: Oh, he got the right.
[Dee Morris]: I see. Is it next door to what he already does? Yeah. Okay.
[SPEAKER_01]: That was luck. Yeah.
[Clayton]: All right. Okay. All right, any other new business?
[2kAt0v9zwyw_SPEAKER_00]: I got two new guys.
[Clayton]: Oh, perfect.
[2kAt0v9zwyw_SPEAKER_00]: And in two weeks, I'm going to get another one. So we'll be back. Awesome. And hopefully they stay.
[SPEAKER_01]: When are you getting another one?
[2kAt0v9zwyw_SPEAKER_00]: What's that?
[SPEAKER_01]: When are you getting the third one?
[2kAt0v9zwyw_SPEAKER_00]: The 16th.
[SPEAKER_01]: Oh, so it's already been hired.
[2kAt0v9zwyw_SPEAKER_00]: Yeah, yeah, nice sign the acceptance letter and he'll be here on the 16th.
[SPEAKER_01]: Very nice.
[2kAt0v9zwyw_SPEAKER_00]: Is that everybody you fully staffed at that point. For what jobs that they had on the pay on the box. Yes. Okay.
[SPEAKER_01]: I feel like there's 1 thing that I didn't remember, but let me see if there's anything else. Let me see. I had to tell you something.
[2kAt0v9zwyw_SPEAKER_00]: I'll be coming in to pick the leaves up the week after Thanksgiving.
[Clayton]: Okay. Well, it seems like this meeting was just really quick reviews and updates. It doesn't seem like you have a lot of new business either. So this will be a shorter meeting today than typical.
[Dee Morris]: Okay.
[Clayton]: Um, let's look at when the next meeting needs to, um, be as well. Hopefully everybody got a chance to go and vote today. Oh, yeah.
[2kAt0v9zwyw_SPEAKER_00]: That's the 1st to December 1st.
[Clayton]: Oh, wow.
[Clayton]: Um, this everybody available on December 1st. Yes.
[2kAt0v9zwyw_SPEAKER_00]: Yep.
[Clayton]: How about you, Steve?
[2kAt0v9zwyw_SPEAKER_00]: As of right now, I have some time to use. I just got to figure out when I'm going to do it, but I could make myself available.
[Clayton]: That would be nice. Let's set the next meeting for December 1st. 7 PM? 7, yes. If there's any updates, that I get by email, I just forward it to everyone. But as I said, I didn't get any emails for this this period of time. And also we had talked about last time because there's going to be a oh, I'm sorry, I think I missed one step going back to old business. Sorry, I just I just realized that. Did I mention that there would be a public hearing as well with the the after No, I don't think so. Okay, so that I missed. I'm sorry about that. So after the press release and the community input with the polling, then there would be a public hearing so that anybody who feels one way or the other has an opportunity to voice those opinions. It hasn't been said. It would happen after January because that's when we're expecting the press release to go out and the polling to be done. and that will prepare for the open forum so that everybody can weigh in. And that's an essential piece that I actually forgot. So can you just update that for me, Darlene, that there will be a public hearing? And so everybody who has contacted us so far with their dissent for having the Seven Acres Project continue would be invited.
[Dee Morris]: But to this hearing, anybody was going to have again, that stress on community. Yeah.
[Clayton]: Yeah.
[Dee Morris]: Here are needs and here, how can we do this in the most attractive and practical way possible?
[Clayton]: Yeah, absolutely. Yes. Sorry about that. I, I missed that in the translation there. Sorry about that. All right. If there is, is there any other questions? Anything else?
[Unidentified]: Nope.
[Clayton]: If not, then I will entertain a motion to adjourn the meeting for tonight.
[Dee Morris]: I'll step forward and entertain your entertainment. And we close the meeting.
[Clayton]: All right. It was moved by Dee to end the meeting. Chris is second in it. If there's no further discussion, all in favor, say aye. Aye. It's unanimous. Recording stopped. The meeting is adjourned. Well, I can't believe that we're in November, but we are. The next time I see you, I have to say happy Thanksgiving from now because the next time I see you, it'll be gone. I hope everybody has a safe and productive time with family and enjoy their holiday.
[Unidentified]: Thank you. All right.
[Clayton]: I do. I'll see you sometime soon. Steve up there because somebody that we know passed away. So I'm pretty sure that's where she's going to be. All right. Okay. I'll talk to you guys soon. Thank you. Bye.