Community Preservation Committee 10/27/26

AI-generated transcript — the recording is the record.

AI-generated summary. Written by gemini-3.6-flash from the transcript below, which is the record. It may be incomplete or wrong; it does not report votes. Every item links to the moment it began.

The Medford Community Preservation Committee met to review FY27 CPA funding applications for historic preservation, open space, and recreation projects across the city. The committee heard presentations from project proponents and addressed small grant requests and procedural business.

  1. 0:59 Shiloh Baptist Church Stained Glass Window Restoration — Representatives from Shiloh Baptist Church presented an application requesting $225,000 in CPA funds to restore historic stained-glass windows, with committee members requesting additional vendor estimates and baseline survey documentation before a vote.
  2. 20:00 DPW Victory Park Courts and Tree Planting Proposals — Department of Public Works Director Tim McGivern presented proposals for $264,000 to resurface tennis and basketball courts at Victory Park and $75,000 to plant approximately 100 trees in public parks.
  3. 39:11 Barry Park Playground Redesign Proposal — Parks and Open Space Planner Amanda Centrella presented a $134,000 funding request to design an accessible playground overhaul and evaluate green stormwater infrastructure at Barry Park.
  4. 58:05 Medford Public Schools Playground and Curtis Tufts Preservation Studies — Chief Operations Officer Ken Lord presented applications requesting $250,000 to design accessible playgrounds at three elementary schools and $40,000 for an architectural design study to restore the historic Curtis Tufts School building.
  5. 1:22:41 Unitarian Universalist Church Rectory Roof Small Grant Application — The committee reviewed an urgent small grant application for $17,640 to repair a leaking slate roof on the Unitarian Universalist Church rectory, requesting the applicant clarify the long-term scope and repair approach prior to a vote.
  6. 1:36:33 Recreation Department Condon Shell Lighting Fund Transfer Request — The committee considered a request to transfer $50,000 from the Tufts Park lighting grant to cover a bid shortfall for Condon Shell lighting, advising staff that the department must formally request a grant reduction and submit an off-cycle application instead.
  7. 1:54:03 Approval of Meeting Minutes — The committee voted to approve the meeting minutes for September 8, 2026, and October 13, 2026.
Back to all transcripts

More from this committee: CC Community Preservation Committee

[Chair Roberta Cameron]: I will call to order the meeting of Medford's Community Preservation Committee. It is Tuesday, October 27, 2026, 6.30 p.m. We are meeting hybridly with some of us being located in room 201 of Medford City Hall and some of us joining via Zoom. A recording of the meeting will be made available as soon as possible afterward. So we have on the agenda today some interviews with some of the applicants who are applying for CPA funds for this fiscal year. I understand I just had a rundown at the order of applications that are in the agenda may not be exactly what we follow today. it sounds as though the Mr. Harbor Watershed Association for one would like to defer until next meeting. So we do have folks from Shiloh Baptist Church who I would invite to join and tell us about the application they've submitted this funding round.

[Community Preservation Manager Theresa Dupont]: Mr. McIntyre, if you can hear us. Yes. Yeah, there he is.

[Singleton]: Thank you for joining us again. Good afternoon. Do you see me?

[Community Preservation Manager Theresa Dupont]: We don't see you, but we can hear you very clearly.

[Singleton]: Let me try again. I thought that I was able to, I clicked on it, but it doesn't want to see, show me for whatever reason. I'd like to thank you very much for all your participation over the past year or so. We've got daycare centers up and running. That's a part of that community effort to access that's worked out well for us. Now, we have a community need for improving the historic preservation of the windows there at Shiloh Baptist Church. As you know, this building has been built back in the late 1800s, so it's been through a few reiterations over the past hundred years or so. And now it comes time to make sure that we keep the building in good shape and be aesthetically pleasing to the people passing by, as well as membership here at the church. So that we like to take your gracious grant and use that to improve the quality of the life of the community there, as well as do some energy savings, as well as preserve the church historically.

Is there any comment?

[Community Preservation Manager Theresa Dupont]: Mr. McIntyre, just so you know, I am putting up some pictures on the screen of the current condition of the windows so folks can see. Like the picture here on the right, I'm trying to show how some of the panels have kind of buckled in on themselves a little bit. It's supposed to be straight up and down, but you can kind of see that it angles in a bit here.

[Doug Carr]: What's the plastic in behind me? Is that what I'm seeing?

[Community Preservation Manager Theresa Dupont]: The plastic's in front. This is like an energy. Yeah, it's on the interior of the building. It's like an energy saving.

[Chair Roberta Cameron]: If I recall, there are actually some missing glass panels here and there, so that is very important too.

[Singleton]: The thing is that over the years that we've made some homemade remedies is to keep the temperatures of the church at a regulated temperature as well as preserve the windows themselves. That's the effort that we've done on our own. There has been some contributions to an earlier effort to put money into this program, and that's isolated and it's in escrow. So the last time that we started down on the windows, that was an early reiteration of a grant that later on got changed to an excess need for handicapped individuals approaching and wanting to use the church, as well as improving the opportunity to have a daycare in place.

[SPEAKER_18]: Thank you.

[Chair Roberta Cameron]: So I can leave with that question. Have you begun to address any of these windows with the grant funds that you've received so far? Or are you waiting for a new funding to start?

[Singleton]: What we have done is there has been a survey earlier, approximately, I guess, to almost 2 years now to acknowledge what the primary windows that need attention in terms of priority. So that was done by SSV architects. So that there is a plan of operation and place as well as some survey of. People who do stay in glass windows, so that we have some. idea of what the cost would be. I think that one of the issues that we talked about was about $250,000. It would be a very good number to work with at this time.

[SPEAKER_07]: There he is. Hi, Cliff. I apologize. Truly, truly apologize.

[Community Preservation Manager Theresa Dupont]: That's all right. We kind of took things out of order.

[SPEAKER_07]: I'm so sorry. No, don't be.

[Chair Roberta Cameron]: Not at all. All good. Are there questions from other board members about this project?

[Doug Carr]: More of a comment than a question. Obviously, we've supported this church a couple of times, and this is a continuation of that. There's no doubt about its historic relevance, obvious significance, or anything like that. I think it would be helpful to have that survey for these windows in the record so people can see that, because the spreadsheet lays it out very clearly. But sometimes a picture's worth a thousand words in terms of understanding what we're doing. I think the PowerPoint actually makes a really great case for the need for these windows. And we know this is kind of pre-approved as a building, as a project, because we funded it before. So I think it's fairly straightforward. Obviously, I've supported it before. I'll continue to do so again.

[Chair Roberta Cameron]: So just as a bit of background for our members who were not here when this church was originally approached the CPA for funding. The first grant that they received was to work with an architect to prepare a condition assessment for the building, and that architect identified what the priority needs were. And as the church members anticipated, The windows were the highest on the priority for actual historic preservation, but what they didn't anticipate was that providing handicap accessibility was an even higher priority in order to both help people who might be, because the church wasn't accessible for people with disabilities to get to the lower level at all. And they had an opportunity to open up their doors to bring a childcare provider into the building. And that provides a more active use of the building, long-term revenue stream and a partnership so that the building is more accessible more used, well used by the community. But meanwhile, the windows remain in need, both for exterior preservation, and I think, you know, the condition of the windows might even be considered a hazard to leave them in the condition that they're in.

So that's why we're seeing the organization come back to us now requesting additional funding to be able to go back to the window project.

[Community Preservation Manager Theresa Dupont]: Um could I ask for clarification on something you just said Doug when you said the spreadsheet is this what you were talking about the estimate and then you were perhaps requesting to see like a visual like what at 14 the window is and what yeah the survey document I don't know if I've ever seen that okay I think that would be helpful for the context yeah and so the architect SSV prepared a report a report yes in 2022 um which does and forgive me Bill and Cliff um that does have more color about the individual windows. This is just an updated estimate. But yes, we can certainly make sure that they're both available.

[Page Buldini]: I have a question for clarification. If this were to go through, would the replacement of the windows hinder the child care provider? Would they need to relocate or any of the parishioners or individuals that use the church? Would it just be something off hours?

[Chair Roberta Cameron]: What would likely happen is that the windows as they're working on them would likely be removed from their space and put a temporary block in its place and then restore them offsite and bring them back and install them. So to my understanding, that would not interfere with the job there. Correct me if I'm wrong, Cliff.

[SPEAKER_04]: You're correct. You're correct on your answer.

[Suzanne Galusi]: former committee member and local councillor. A question from Joan. Thank you.

[Vice Chair Joan Cyr]: Yes, I have a question about the application. I just want to make sure I'm understanding what I'm seeing. So on the second page, it says that the the funding request is 85% of a total cost of 175. But then I go down to the summary and it says FY27-ASCA is 225. So what is the application for?

[Community Preservation Manager Theresa Dupont]: The application is for 225. The project right now with escalation and additional contingency is coming in just under 375. They have 150 in here, so the request tonight is for 225.

[Vice Chair Joan Cyr]: So, vacation says 175, I'm just saying, because when you just read it, you know, it's like, you have to see 2 different numbers and I don't know what we're looking at and where it's at. Is 175 where you started and then you add escalation. So that got you to 225. So to see that math somewhere in the application would be helpful because I don't know what we're looking at. Because then I go down and I see updated window estimate for 78,000.

What are we looking at? What is the request?

[SPEAKER_07]: The request is 225.

[Vice Chair Joan Cyr]: Right, where is the backup for that estimate? That's what I'm saying. The applications need to have some backup about how you came to that number.

[Community Preservation Manager Theresa Dupont]: If we were to look at the budget form, Joan, that might help kind of clarify a little bit more about how we're getting to that figure. Because the estimate, I hear what you're saying, the estimate is for 371 and change. down at the very bottom of that, the actual estimate.

[Vice Chair Joan Cyr]: And that's fiscal year 26 and 27 combined? Yes.

[Community Preservation Manager Theresa Dupont]: Correct. That is the total project cost. They have $150,000 in hand from fiscal 26 to get them to that 375 number, just to add a wee bit more contingency. That is, the request tonight is for 225, which gets them to that 375 figure in total.

[Vice Chair Joan Cyr]: Okay, so this is just just going again for this kind of money. I expect to see an estimate from a vendor. That says, this is my estimate and these look like they're made up by your Excel spreadsheet to say, this is what so it's like, there's just missing pieces to the story. You know, you got these numbers somehow from a vendor.

[Chair Roberta Cameron]: Were these numbers provided in the report by SSV? Correct. Okay.

[Community Preservation Manager Theresa Dupont]: This is an update, a 2026 update of the initial 2022 estimate that they. Okay. So it is kind of missing like, I guess, a letterhead. Yeah, there's no letterhead. There's no.

[SPEAKER_07]: We got those from Gerald.

[Community Preservation Manager Theresa Dupont]: Yeah. which we can go back to Gerald and get more official looking figures here. To your point, Joan.

[Chair Roberta Cameron]: And the original report will also help to contextualize this. Yes.

[Vice Chair Joan Cyr]: I always like to follow the money to coin a phrase. Where does it start and where does it end?

[Community Preservation Manager Theresa Dupont]: I appreciate that. That's why we need you. I just want to recognize that Jeremy joined us. Thanks, Jeremy, for joining.

[Chair Roberta Cameron]: Thank you.

[Jeremy Martin]: Hi, everyone. Sorry I'm a little late.

[Chair Roberta Cameron]: No worries. Another question I have about the budget spreadsheet is whether the organization has any funding from other sources to contribute to the cost of the windows. whether there's fundraising by your own organization or whether you've been able to apply for any state grants to pay for the window restoration.

[SPEAKER_07]: So far, we've been raising money through the donations, the signs that we have outside that folks have been contributing to, and ourselves that we've been donating to the funds.

[Chair Roberta Cameron]: OK. It would be helpful to add a line in this for donations. And I would also love to see you try one more time to apply to the state, what is it, MPPF grant or something like that. Massachusetts Preservation Funds.

[Doug Carr]: Yeah, that's very competitive really. Is it? Okay. War times were enveloped, got it the first time, never got it again. There's 350 communities going for it. It's not a bad idea, don't get me wrong, but the odds are low.

[Chair Roberta Cameron]: Okay, that's helpful to know.

[Doug Carr]: And there's future restoration efforts that I think could be geared towards that too, in parallel. Like do this, but also do the same thing. I'm thinking of the exterior and stuff.

[Suzanne Galusi]: Yeah. Okay. Are there other questions from committee members?

[Losa Julie Genevieve]: Hi, I heard he mentioned that Clifford mentioned that some of the windows they had some, they try to do some renovation themselves. is what I'm trying to figure out is all the windows is damaged and there's some of them that you already have restored that can be, how would I say, taken away from the amount of windows that you have to repair right now. That's what I'm trying to come up with.

[Singleton]: Let me say this. Many years ago, the upper third floor, there are windows that were done. Not recently, but many years ago, those stainless windows were done. I don't know how the survey was done, but the lower section of the vestibule as well as the two chambers, those are larger windows that require a little bit more attention because that's a specialty item. The upper floors are more conventional windows, though they're stained glass. So the cost is a little different. Now, the thing is, we do have some money that was put in escrow as the good chairs indicated, but we've been doing some of the weather tightening to make sure that we don't lose what we have. But those are sort of temporary efforts.

[Losa Julie Genevieve]: Thank you.

[Chair Roberta Cameron]: And I just want to acknowledge that in the pictures that we saw, most of the windows did not have religious imagery in them. And the report, when we see the full report, I think identifies windows that have a small amount of religious imagery in an otherwise, like, yeah, basic design. So we had originally told them years ago when they approached us that we would be looking for a match of funding from the organization or other sources to go along with the CPA funding so that we could demonstrate that they're using their own funds to restore the religious imagery and that the city funding would be Yeah, used for the windows with non-religious imagery. Thank you. All right. Additional questions?

Well, thank you very much to the team from Shiloh for being here this evening.

[SPEAKER_07]: Thank you. Thank you. Again, I apologize for my tardiness.

[Chair Roberta Cameron]: Oh, you're all good, Clay. You're all right.

[SPEAKER_07]: Thank you.

[SPEAKER_04]: I'm somewhat under the weather here.

[Singleton]: Thank you very much and I look forward to your vote. Thank you.

[Community Preservation Manager Theresa Dupont]: Thank you. Feel better.

[Singleton]: Thank you. Thank you.

[Chair Roberta Cameron]: All right. Next on the agenda, I do see on the agenda Medford Planning, Development and Sustainability in Medford Public Schools, but I don't see anyone in attendance from... Ken will be joining.

[Community Preservation Manager Theresa Dupont]: At about seven, he has another meeting. I'm not 100% sure where Amanda is. I can text her. We do have Tim McGivern here.

[Chair Roberta Cameron]: So why don't we go ahead and invite Tim to talk to us about the request. Tim, are you available?

[Tim McGivern]: Oh, yes. Just turning my stuff on.

[Community Preservation Manager Theresa Dupont]: Thank you.

[Tim McGivern]: Good to see everybody again.

[SPEAKER_18]: Yeah.

[Chair Roberta Cameron]: Thank you. And we are talking about Victory Park, courts and tree plantings. Anything else, Teresa? Just those two, the tree plantings and Victory Park.

[Tim McGivern]: Okay, thank you. And Victory Park is a one basketball court and one tennis court job. Yep, Teresa, I sent Teresa a presentation. I couldn't quite figure out how to do it with one screen on a laptop. So Teresa's got a little slideshow. It's short, but it shows you the condition of the cords and a little bit more. Are you having technical difficulties? Oh, there it is.

[Community Preservation Manager Theresa Dupont]: Yeah, so you were trying to share from one laptop. I'm on a laptop and a 72 inch monitor.

[Tim McGivern]: I got it. All right. So it might be even more difficult for you, but I trust you with this stuff more than me. So you can see the courts just in this cover picture. Those are the courts right there. And you can go to the next one. These are the 2 projects that the DPW is proposing this funding round the estimate for victory park basketball court and tennis court is 264,000 and then we're also asking for a pot of money for public park tree plantings for 75,000 next slide.

So Victory Park courts, the existing conditions, and I have some pictures, cracking, heaving in the playing surface. It's the last poor condition tennis court in the park's inventory for the DPW. It has a deteriorating fence and non-standard hoops. Next slides. Just some pictures of the cracking and the heaving. Next slide.

[SPEAKER_18]: It makes me nostalgic for all the other parks that used to look like that.

[Tim McGivern]: Yep. Next slide. So that's a few pictures there. So when it's done, we'll have a fully resurfaced double tennis court with new net, a full resurfaced single basketball court with new hoops, and a new boundary fence and gates. Next slide. This is the budget worksheet, and it's really simple. Because we've bid out these jobs for a few years, we have quite a number of bids. So we just used the playstead bids, which we received a lot of, chopped off the high one and the low one, and took the average. And that's what we used per square foot. Pretty straightforward. And we'll see because, you know, obviously asphalt prices can fluctuate. So we got a contingency built in there for that sort of situation. Next slide.

This is just a snapshot of the parks inventory that we built over the last year or so. And it's just the tennis courts and the, you know, and the information we have on each tennis court at each park. So we have this for, you know, all 33 public parks, basically. Next slide.

[Suzanne Galusi]: Yeah, I think we're getting some feedback.

[Tim McGivern]: I forgot to point out, but on that parks inventory list, you could see one red box for the poor condition, and that's Victory Park Tennis Court. There's a couple of other poor condition basketball courts that we can talk about some other time, because we'll be back hopefully to do those. But as far as tennis courts go, this would be the last poor condition one for hopefully a while. All right, so that's the court project. Any questions there? I just have a couple of slides on trees, not too many.

All right, I'll go forward. So new tree plantings in the parks. So the idea would be to supplement the existing operation and capital budgets for tree plantings. Those budgets are about $160,000 combined each year, $80,000 out of operation, $80,000 out of capital. and this would supplement it just for the parks. Those projects and those funds typically go towards the roads, but they can also go towards parks too, but the idea would be this would supplement it in accordance with the new urban forest management plan that we did and the recommendations in there. We are trying to step up our planting and double how much we do each year. So that would go towards that. The locations would be selected by the tree warden in accordance with that plan. We have 33 small and large parks to choose from and 75,000 translates to about 100 trees, give or take 10, depending on how how they're planted, what kind of conditions you have, and what kind of species and size and so forth. So, but that's roughly 100 species, 100 trees, sorry. Next.

So I talked about the goal and I think it goes without saying for a lot of you folks, trees help restore land, rehabilitate land and preserve land. So if you can plant them, it's a great thing. Trees reduce heat island effects and in general, improve the park environment, provide shade, et cetera. I think that might be it, but next slide, just in case. Oh yeah. Okay, so just a couple screenshots from the urban forest management plan that's the cover there that's available on the website, and then the image there which is I know you probably can't read it very well but that's the inventory and the trees and parks are a special color green they're like that mustardy green.

Riverbend Park, I can see from here, you know, kind of like near the river. Yeah, there you go. So those are those are public trees that are in Riverbend Park. So we would be adding to that particular category of inventory. But I think that's, I think that's it. Is that every tree in Medford on the streets? No, not in Medford, just the ones in our care and control. So the ones in the public trees.

[Doug Carr]: Yeah.

[Tim McGivern]: Yeah, our inventory. So basically what the city manages.

[Community Preservation Manager Theresa Dupont]: Yeah, that's it. If you can see the blue, that's the street trees. I think this teal color is like this vacant site for trees, and then redder stumps, which I know we're working through the stump list. Doing a great job with that, by the way. I love every time I see a stump disappear.

[Tim McGivern]: Yeah, we got some big ones recently that have been around for a long time. So those feel good. Like pulling something huge out of your teeth, you know?

[Chair Roberta Cameron]: What is the status of the tree warden?

[Tim McGivern]: We have a tree warden now. His name is Jim Doyle. And so far, so good. He keeps coming back. And he's excited to help out Medford. So it's fantastic.

[Chair Roberta Cameron]: Great. That's good news. Very good to collaborate.

[Doug Carr]: Just a quick question. Tim, this is great work. I'm really excited to be able to find more trees in Medford. I think it's an easy call for me. But your diagram showing the parks, it feels like after really more than 10 years of you guys really investing in parks, CPC has actually helped that, obviously, too. I feel like as a city, we're kind of catching up a little bit, because it seems like we were way behind 10 years ago.

A lot of parks are deteriorating, and I feel like we're at a sustainable point. Is that a fair statement?

[Tim McGivern]: I think we're getting there. I think if I look at that inventory just in our parks, and it's not public yet. We're still kind of refining it. We're trying to get into GIS as well. But the playgrounds are hurting, and I know the planning department is taking a look at all the playgrounds and all that. But a lot of them were installed at the same time, about 25 years ago or so. Yeah, so when we have a lot of parks and we have a lot of small parks that don't receive a lot of attention that could receive more attention. So there's like, you know, under underused land that could be seen as something we could move move to look at and you know how best to utilize that space. So, I think there's lots of opportunities still out there for sure. Thank you.

[Ada Gunning]: Sorry, was the tree planting part of Victory Park or was that at Riverbend? Sorry, I thought I heard you say Riverbend.

[Tim McGivern]: It would just be, so we have 33 public parks that the DPW manages in the city. So it could be any of those places. And we'd work with Teresa to make sure that it's meeting the interests of the CPA, which I believe would be parks and open spaces.

[Ada Gunning]: So unrelated to the Victory Park presentation you did.

[Tim McGivern]: Correct, yeah. Victory Park would just be like taking exactly what's there for a tennis court and basketball court and just making them new, basically.

[Ada Gunning]: OK, sorry, my lighting is really terrible. Because Victory Park needs to, I think, be redone. So it would be a shame to put trees there before we did that was the only thing I was thinking.

[Tim McGivern]: That's one of the playgrounds that I was kind of thinking about, because it was kind of center of mind tonight. That playground was built 20 plus years ago. And we have trouble just making sure that it's not in disrepair. But I know the planning department is looking at it. And that's not my world. I'm just operation and maintenance. So that's why I'm putting tennis courts back exactly how they were. Thanks.

[Suzanne Galusi]: Yeah. Jeremy?

[Jeremy Martin]: Hey, everyone. Tim, I'm sorry if you covered this earlier. I was having audio issues, as you could hear. Just what is the process for deciding where the trees will go? You'll work with Teresa. Is there any study or anything that goes into that? What are you thinking there?

[Tim McGivern]: So I'm going to talk to the tree warden, so it's going to be ultimately that that position's responsibility in the city is to determine where new tree plantings go. And I think it's important, though, to keep Teresa in the loop and understanding that we should report where we planted the trees. But we also have the urban forest management plan, which talks about heat island effect and where we have taken out trees, but not replace them per se. So there's a lot of information in there. So he's been directed to use that document for all of his tree plantings. So this would just be 1 part of tree plantings and he's got like, 3 or 4 right now just because it's operations and capital money. And a grant another another grant. Thank you.

[Chair Roberta Cameron]: I just wanted to make an observation going back to what Ada said about the playgrounds and the need for renewing the playgrounds. My kids, my youngest is 19. So the playgrounds were kind of new when I was taking my kids to the playgrounds. And they were often like terrible heat islands themselves. There were no trees anywhere. to cast shade over the playgrounds, so we couldn't even use them in the summertime. So it would be, I really hope that tree planting near the playgrounds is part of the design in the next iteration. But that leads to another question that actually you and or Amanda Centrella might be able to address, which is what is the status of our open space and recreation plan update.

[Tim McGivern]: So yeah, I'll let Amanda handle that one. And if she's on the call, she might be able to talk about playgrounds too, because that when we do a playground, we don't replace it as is we upgrade it for lots of different reasons. And the planning department handles like the new planning type stuff in the parks. So thanks.

[Amanda Centrella]: Hi guys, so apologies. I only logged on maybe a minute ago, but I caught the question about the OSRP, but I don't have what y'all were talking about beforehand.

[Chair Roberta Cameron]: We were just talking about, so I'm sorry, I'll give a little background. Tim just presented to us about the basketball and tennis courts at Victory Park and tree planting, which led to a discussion about how we select locations to put trees in the parks with the CPA grant. And so that led to a question about what whether we're planting trees in areas that are going to be renovated in the near term. So that is why then I asked about the open space and recreation plan.

[Amanda Centrella]: Awesome, great. So our open space and rec plan, we applied for what's it called an eco one stop MVP grant last year to update the plan. Unfortunately, it was a sort of record breaking competitive grant round and many applications that would have traditionally been funded by a grant like this, as well as it was like a joint grant between the MVP and an EEA planning assistance grant were not funded, particularly in the Mystic River watershed area. So that application was not accepted. That said, the grant round is opening once again, and I just had a sit down session with the grant administrators to understand what could make this application more competitive. They gave me some tips, our office some tips, and we will be attempting to apply again. Um, all that said, there is, we did technically extend our grant. Sorry, our open space and rec plan to be, um. Uh, what's the word. It is allowed to, we are allowed to continue to use it and it to be recognized by the state until 2029. The preference certainly would be to update the plan and do a comprehensive overhaul before that point. But at the very least that guarantees us safety from, you know, being disqualified from certain state grants that we would normally apply for between now and then.

[SPEAKER_18]: Thank you.

[Chair Roberta Cameron]: It's almost like safe harbor. The risk is being disqualified from state grants that we would typically depend on to be able to make happen.

[Doug Carr]: So it's a five year cycle, right? Some good five or seven.

[Amanda Centrella]: It used to be seven, but the state expanded it to 10 last year. And so, or sorry, about a year and a half ago. And so during that time window, we did a lot of outreach and, um, sort of updated the plan in a smaller way, um, and applied for that extension, which was granted.

[Doug Carr]: What is the cost of this grant that you didn't get? We didn't get to, uh, update the plan.

[Amanda Centrella]: So we wanted to include some things in the plan that made it a little atypical from a traditional OSRP, which apparently OSRPs are no longer required to have accessibility audits of playgrounds and park features in them, but we felt that that was actually rather important for us. So that's included, and our OSRP is pretty interesting because it's actually got a bunch of climate resiliency recommendations that were not a part of the traditional requirements of an OSRP, and we'd want to be continuing that. thought that effort as well. So all that is to say the grant ask was around, I think, like 70,000. And usually you might see them closer to, or just like, that that's taking into account some extra services.

[Doug Carr]: Is it inappropriate to ask why we couldn't fund it if the state won't? Not this cycle, but next?

[Chair Roberta Cameron]: It's not a best practice for the CPA to fund that as a program, like using our program funding, because it's an, for the open space and recreation and historic preservation, we should be looking to make improvements to specific assets and not to the general citywide inventory or understanding of what our needs are.

[Community Preservation Manager Theresa Dupont]: We had a robust administrative fund budget. Those funds could be used towards citywide plans, reservation plans, recreation, open space plans. It's just not that robust, unfortunately.

[Unidentified]: Fair enough, thank you.

[Chair Roberta Cameron]: Well, thank you. I think that Includes our presentation from Tim. Thank you very much for joining us this evening. That was very helpful. And yeah, thanks. Thanks.

[Tim McGivern]: All right. Yep. Absolutely. Yeah, I will. Bye.

[Chair Roberta Cameron]: And we can segue into inviting Amanda to tell us about tell us about the project that you are applying for.

[Community Preservation Manager Theresa Dupont]: And Amanda, just really quick. Is there anything that I can screen share on my end? I have the application as well as all the visuals that you provided in the application. But if I can screen share anything, let me know. Or if you want to.

[Amanda Centrella]: All right, so I can screen share, but I will put, just in case it helps for your setup there, Teresa, I'll put the link to my presentation in the chat, or maybe I will put it, I'll Teams it to you.

[Community Preservation Manager Theresa Dupont]: Okay. I'll sign back on Teams.

[Amanda Centrella]: Oh, sorry, Teresa, no way.

[Community Preservation Manager Theresa Dupont]: No, it's okay, no, no, no. I just always,

[Amanda Centrella]: That makes sense that you wouldn't be. I can also put it in the chat. Okay. All right. So with that, I'm going to share my screen if that's okay.

[Community Preservation Manager Theresa Dupont]: Amazing.

[Amanda Centrella]: All right, bear with me all for just a moment. We'll put this in presentation mode. All right. So hi, everyone. Quick reminder, I'm Amanda. She, her and I work in the Planning, Development and Sustainability Office as a Parks and Open Space Planner. And I'm very excited to talk about Barrie Park playground redesign with you all today. So our proposal is to request roughly $134,000 to redesign the playground at Berry Park, to also evaluate some nature-based methods for stormwater infiltration in the park, and to consider future improvements.

So a couple of things about this park. Berry Park is about three and a half acres in size. it, our open space and rec plan lists Barrie Park as high priority for renovation. It talks about accessibility in the playground specifically. And additionally, it ranks Barrie as fifth highest priority for climate vulnerability. And that's where some of the, there's a direct recommendation from the OSRP to consider green stormwater infrastructure in the park. Um, Ferry Park serves the hillside neighborhood. And if you, it's like a little visual over here. Um, so if we do like a quarter mile walk shed, um, around the park that is serving roughly 1,150 households in that area, um, with, you know, the darker colors here being slightly denser areas, it's, um, parcel density. So units, housing units on the parcel. and also along here, but in general kind of a slightly denser part of the city.

And the park is also served by the 96 and the 101 MBTA bus routes and is a 15-ish minute walk to the Medford-Tufts Green Line MBTA station. So this actually expands sort of the access that people have to this park from other parts of the city or outside the city. All right, so a couple quick facts, the playground, oh, oops, okay, well, the playground was built in 2001, roughly, and those, so public playgrounds have a lifespan of roughly 20 years, give or take, so it is sort of at its end of life, and when DPW has been doing some internal reviews across the city of our open space facilities and green space facilities, And has noted this park and playground in particular as in like fair to poor condition.

The playground contains equipment that's appropriate for 5 to 12-year-olds. And there are some accessibility challenges to the playground. So you'll see here that it uses a play surface called EWF, which is engineered wood fiber, kind of like wood chips. And that is really no longer considered accessible by the MA Architecture and Access Board. This is a ramped playground, and if I go to a future picture. So you can see here that there is access to the main play structure from an accessible route. But there are some features that are not accessible, such as the swings, which you can see here, there's no accessible route to. And on top of that, DPW anecdotally has shared that this playground gets a lot of calls for repairs.

So, you know, it's really due for an overhaul. Go back a little bit. So there is opportunity to do some green stormwater infrastructure in the park, impervious surfacing in the area, which I meant to have this slide earlier, sorry y'all. You can kind of see here that, you know, across a lot of the city, but in particular around Hillside and South Medford, there is a decent amount of impervious surfacing. And so there's a lot of opportunity to kind of capture stormwater runoff in our green spaces and parks.

And actually. For those who are familiar with contour maps, you can see here, so the lines are showing elevation above sea level. So this is, I think, gosh, I cut it off right out here, maybe 31 at the peak up here, and gradually sloping down from there to 13 feet above sea level. Um, so you kind of have this, like, gradual decline, um, towards the northern end of the park. And interestingly, there is a lot of, it's like, this is sort of like, one of the denser areas of, um, the neighborhood around the park. This and over here too, where you can kind of see some interesting sloping going on. And so definitely, I'm not an engineer, I don't pretend to be, but I think that there's a lot of opportunity to do some meaningful stormwater capture and infiltration in our park here.

And as part of this proposal, we think that this is a great time to start talking to community about kind of broader uses at the park. There's this brand new, beautiful community garden in the space. There are conversations from dog owners and non-dog owners about having off-leash spaces in and around the city. And so we wanted to kind of bake into this process some broader conversations about future uses in the park to set us up for changes in the future.

here's some just shots of the basketball courts and, you know, edges where maybe we can do some green stormwater infrastructure, um, whether that's bioswales or rain gardens, um, we would work closely with DPW on what's realistic and practical for maintaining those types of spaces. And I actually think, um, as you guys are very familiar with a really awesome community led project on Grove or to create a Grove on College Ave. And we can take some cues and pointers from the types of plantings that Trees Medford has done or is doing for that area.

So project scope will include a topographic survey, which will be really important for us to get us any further really than a concept design. The design itself, we baked in some costs for having the consultants join us on community outreach. definitely have at least one online survey. We'll do some public tabling sessions, whether that's at the park or at events where it makes sense for us to link up. We'll have some stakeholder sessions with the design team. These are just baseline things that we can absolutely expand upon. City staff can do more stakeholder sessions or have additional tabling sessions or do an interesting workshop with the Medford Family Network playgroups or something like that. And I'm always open to ideas on that front. So whether that's on this meeting or in the future, my email inbox is open. that will include a cost estimation, which will be really important for us for planning for grants and funding for the project in the future. It includes bidding support and construction administration so that we can move really swiftly once grant funding is teed up. And as I mentioned before, kind of larger conversations around uses at the park will be baked into this as well.

And here's our little budget summary. So topographic survey, design services that get us to construction documents, bidding assistance, construction administration. All right, so I'll pause there and see if folks have questions.

[Chair Roberta Cameron]: Are there questions among committee members?

[Doug Carr]: Just one. Amanda, in terms of creating this project similar to this design, this is a design budget, obviously not a construction budget. Have you needed contingency for design? Any unforeseen CA tasks or additional design tasks? Would it be prudent to bump that number a little bit just internally so you could have a few dollars to play with if you needed it?

[Amanda Centrella]: That is a great question. Most of the design has followed our proposal fee pretty well, and where there have been change orders have been when, okay, maybe we've made additional asks for community input sessions, or maybe some additional coordination needed with some consultant or contractor, like in this case, maybe with a civil engineer for the Green Storm Water stuff. Um, but I guess the short answer is it certainly wouldn't hurt, but, um, I, uh, I also don't know how competitive this round is. And, um, I think we could, you know, make it work without the contingency.

[Unidentified]: Okay. Thank you. Okay.

[Chair Roberta Cameron]: I had a question. When you're looking ahead toward the implementation toward construction at this part, hopefully by that time we will be eligible for state grants that might be able to contribute to construction. But have you identified CDBG as a potential funding source for construction at this playground or have you identified Playgrounds around the city that would be eligible for CDBG funding and what the priorities might be for directing that source of funds toward these projects.

[Amanda Centrella]: Great question. So CDBG has actually, I think, been a little bit more narrow, like the eligibility of parks for CDBG funds has like narrowed greatly over the years. And so, recent parks that we've been able to justify CDBG To, um, for have been Tufts Park and Riverbend Park. And I'm actually not sure that there are very many other parks that would qualify. Um, at this point, I did just have an interesting conversation today with our economic development director, Kayla, um. About the nurse, uh, which, oh, gosh, I'm going to forget the name, the acronym. I don't know if y'all are familiar with this initiative. It's a neighborhood.

It's basically a designate like a district designation that would make access to CDBG funds a bit easier for things within that district. And so, you know, incorporating some of our parks into that district where, where it makes sense and where it's touching. low to moderate income census block groups is a conversation that we're having. But so the short answer is Barrie Park would likely not be eligible for CDBG funds. But where CDBG eligibility comes into play, which we could do citywide and is less restrictive is on accessibility features, but not playground features that are accessible. Um, so sidewalks or curb cuts or, um, accessible types of amenities like seating and tables, um, that is easier to justify CDBG funding for, um, and it's less sort of, um, constrained to certain parts of the city.

[Chair Roberta Cameron]: Right. I'm glad that you're thinking strategically about what other funding sources the city might be able to apply toward these projects. Other questions? Oh, I do have one more question. Sorry. You mentioned the playground surface is not ADA compliant. I recall in the past a CPA project to install structured, what is that called, the wood engineering wood, replacing sand that we previously had in playgrounds to make them more accessible. So I feel like accessible surfaces is like a moving target that we're trying to hit. And I wonder what actually qualifies as an accessible playground surface. So what are we, you know, what is that likely to look like in the future? And how do we ensure that it continues to be considered accessible?

[Amanda Centrella]: Great question. Um, so the gold standard for accessible surfacing in playgrounds right now, at least, or has been, um, is poured in place, rubber surfacing. So it's kind of that. Like it comes in all sorts of colors. Um, you see it at a lot of our playgrounds, um, car park, for example, in McGlynn playground, both have entirely poured in place surfaces. Um, the caveat with that type of a surface is that they are very much more expensive upfront costs. But the offshoot is that maintaining those surfaces and having them be safe and meeting the safety thresholds that they're meant to meet is way cheaper and easier for the city. Because with wood chips, they're meant to be topped up seasonally, and they can't be compacted. They need to be raked.

And so there's a lot less maintenance that goes into a poured in place surface. That said, you can have wood chips. It's a perfectly acceptable safety surface if you're taking out the accessibility piece. And you can use a combination of rubber matting, or you can do a route that is accessible made of board in place with the surrounds of it. uh, filled in with engineered wood fiber. Um, so there are different ways to kind of, there are different combinations of materials that you can use to hit both your accessibility priorities and other priorities that you may have or stay within a budget. Um, but I think, uh, the short answer is that the poured in place rubber is sort of the gold standard for what's accessible. And contrary to what others may know about it, it is permeable. So we're not creating lots of impermeable surface across the playgrounds.

[Chair Roberta Cameron]: Thanks. I do also remember like one of the impetuses for the MacLenn playground, like entire review was realizing that we needed to eliminate or to restore 25,000 square feet of port in place surface that used to exist there, which was going to cost a half a million dollars on a 20 year cycle. And so I feel like the port in place surface sounds like not, or like as if an entire playground surface doesn't really sound like a good idea from my lay person's understanding of how, like what, what goes into these projects. So, um, I hope that when we redesign the, the Berry playground, we'll be looking at what is economical and, uh, uh, a safe and accessible surface.

[Amanda Centrella]: Absolutely. And I think too, like, there's a lot of learning left for me to do on sort of the exactly that, like sort of thinking around maintenance and lifespan on paper, port in place, lifespan, and a playground equipment lifespan is actually kind of matched up around 20 years. And so a question I have is, Okay. Is there, you know, a way to maintain these where they, we get the most out of them and can, you know, extend that, or is it just that they are actually kind of linked up and at the end of 23rd, you know, 25 years, it's time for an overhaul again. I'm, I'm not really sure. It's a really good question. Thank you.

[Page Buldini]: Anyone else?

[Suzanne Galusi]: Yeah.

[Page Buldini]: Hi, Amanda. Good to see you again. I just want to say how much I appreciate it on the application, the discussion of talking to the other groups. I think car park is a really good example of it being a third space. It's not just a playground. You have the courts that are now covered. You have a dog park. You have all that accessibility. And I know you mentioned the College Ave, the pollinator in the College Ave mini tree forest. There's also the dog park conversation that I know that you've been a part of as have I. So thank you for putting that on the application of the communication and developing this space, because as a person that uses it quite often, and I know that your kids did too, there's not, it's not just a playground. It's also the baseball field. So I think having that vision to utilize the different groups and community groups that are in there, I think is great. So thank you.

[Suzanne Galusi]: Great. All right. Thank you, Amanda. Thanks, Amanda. You all appreciate the time. Yeah.

[Chair Roberta Cameron]: So next on the agenda, we have Medford Public Schools, Playground Design Studies, and Curtis Tufts Preservation and ADA Improvement Study. We have with us Ken Lord. Yes.

[Kenneth Lord]: Good evening, everyone. I'm Ken Lord. I'm the Chief Operations Officer for the Metro Public Schools. I'm here to present two grant applications for you tonight. One is very similar to Amanda's grant she just presented to you. I'll share my screen here.

[Community Preservation Manager Theresa Dupont]: We should be good to go. Can you see my screen now? Yes.

[Suzanne Galusi]: slideshow mode here.

[Community Preservation Manager Theresa Dupont]: We were seeing both of your monitors, but when you went full screen.

[Kenneth Lord]: So this project scope is to hire a consultant to do a design of three playgrounds at the Brooks, the Missittuck, and the Roberts. These three playgrounds don't have the accessibility and features that can meet the needs of our varying population of special ed and regular education students at these schools. We're really seeking to replicate the success of the McGlynn Playground and have equity across our schools. We're to build this into our long range capital plan we really need good cost estimation of what these projects would would cost so we can stage them within our capital plan and and seek funding from the city and other sources to be able to afford these programs. This, these playground renovations. So I did work with some consultants to get some estimates on what a scope would cost. The current playgrounds that I mentioned in all three schools do have aging equipment. They are the poor in place services. So we did just recently over the summer have them all inspected by a certified playground instructor. They've given us a list of minor repairs that we're making to make sure that they're all safe and kept up to up to snuff, but they do need a real good refresh and replacement of equipment and a design that will meet the needs of the schools. The Brooks happens to have two playground areas, an upper and a lower. This happens to be the upper playground area. There's also the turf field that's there next to the parking lot. We just had that redone, so that's all been completely redone and some drainage work done to protect that field. The Misatuck has two playground sections, a small one around the side of the building and a larger one on the backside. And none of these are accessible. They don't have ramps. They don't have any way to get on there for a student. A handicapped student could wheel onto the playground and can access it, but they can't really use any of the features. And the Roberts has one large playground area around the back of the building as well.

The designer would, much in the same manner as Amanda described, work with all of the existing stakeholders to try to develop the needs of the playground for each one. And perhaps each one will have a slightly different theme or flavor to match the school. We'd have to have focus groups with parents and staff and students. We'd reach out and work with Amanda and her team as well as a lot of parent volunteers. and use all of that information from the focus groups to create designs that we would then share with the communities for feedback and then from that create schematic design estimates for a budget for each project. We estimate the cost for the design for all three playgrounds to be about $150,000.

There was some kind of variety of different costs we received from different sources to come to that number. This would include site plans, designs of the equipment we would, the placement of the equipment, the address of any safety issue, making sure they're all would be laid out in the proper way, and then all of the costs that would be involved in that built into a design budget we would then could move forward with trying to achieve funding for.

So that's really the whole presentation. I don't know if you have, I'm sure you have questions for me and like information.

[Chair Roberta Cameron]: Yeah, I stopped page 1st and then Joan.

[Page Buldini]: So, I'm the newer 1 here. So, just to clarify, I noticed that there was 250,000 dollars listed. Thank you, Joan. And I know the breakdown for the schools. was then broken down separately. So I just wanted to be clear, looking through, if you could forgive me for looking through the application for clarification.

[Kenneth Lord]: I'm pretty sure it was 150.

[Vice Chair Joan Cyr]: I think you had it. It still has 250. Maybe it's a typo.

[Kenneth Lord]: Maybe it's a typo. I apologize for that. I can double check that to make sure.

[Community Preservation Manager Theresa Dupont]: Well, if I may, yeah, we should obviously double check. But I think in the application, you had specified that the brook would cost approximately $100,000. Missittuck, $85,000. and Roberts at 65, if we were to only fund maybe one or two of the schools.

[Kenneth Lord]: So maybe I mistyped on the presentation here, then, if it said 250. I apologize for that. I can double check that, though.

[Community Preservation Manager Theresa Dupont]: No worries. You have a lot of numbers in your head at all times. I get it. Way too many.

[Doug Carr]: Those three numbers add up to about 250, right? Yes. Yeah. So that must be what it must be. So it's more realistic to me.

[Community Preservation Manager Theresa Dupont]: You know, I think it was, Ken was at the eligibility form part, that was 150, because we were all parking 50 per playground. But then I think, yeah, once you got more finite estimates.

[Page Buldini]: And just one other quick question. Pardon me, Mr. Lord, but what did we, is it, can you just explain why each school is different? Is it the envelope or the size of the playground with the estimates?

[Kenneth Lord]: So the one consultant we worked with that gave us the estimates, that consultant had gone all the way through construction administration. It's really the size and number of playgrounds that there are. So like the Roberts, for instance, having one contiguous playground is an easier design than the Mississippi with a small and a large and things like that. So that's why they went there. It was really by square footage. And then they did a look at the space, thinking if they needed to do any other kind of curb cuts or adjustments or drainage or other work around that.

[Suzanne Galusi]: Thank you. I see Jeremy.

[Jeremy Martin]: Thank you. Ken, thanks for the presentation here. You just mentioned having worked with a consultant to put together these budgets. I think your presentation and the application talks about hiring a designer. Is there someone, a firm that you've contracted with? No, not the process for for making that selection.

[Kenneth Lord]: So, our 1st step would really be doing an RFP. I believe to hire a designer. There are some designers on the city through contracts as well, but we would like to cast a wide net to try to find someone who's really well experienced in. accessibility and special education and make sure we get the right one. We would certainly consider any on a on a city contract. The one I worked with was on the city contract and I just kind of used her to talk through the process and she didn't provide a proposal just you know knowing I couldn't just pick hers anyways because of the amount of money and public procurement law I'd have to get multiple quotes and things anyway so. So, in that kind of case, what I would do is we would put together a specification, publicize that, hold some interviews, proposals, work with, you know, other stakeholders to be able to select the firm that would really speak to those needs that we want to address.

[Jeremy Martin]: That's great to hear. Thank you.

[Ada Gunning]: I was also looking at the different costs for the different schools. And I'm wondering, is there an assumption that we're going to stick with the basic footprint that currently exists and of what the playgrounds are at these schools? Is there an eye to like equity between the schools? Yeah.

[Kenneth Lord]: So the footprint, we'd certainly use all of the existing footprint. If there's opportunity to use additional space, we certainly would. There isn't a lot of extra space at these schools, as you probably know. These are really tight lots. We certainly would not have support to take any parking. All these schools struggle for parking, struggle for sidewalk space, things like that. I don't know that there is much additional space to use, but we would absolutely want them to look at that because particularly the Brooks, there are some grass areas that we could potentially utilize around the front or the sides to expand that area. So it's not, we're not limiting it to that, but I'm not hopeful there's lots of extra space to be honest.

[Ada Gunning]: No, I hear you. The Brooks is the one I'm least worried about, to be honest. I would be most concerned about the Roberts with the 600 kids in that tiny, tiny playground.

[Kenneth Lord]: Yep. And that's one of the tiniest lots.

[Ada Gunning]: Right. And I would hope that the designers are creative.

[Kenneth Lord]: Yes, very much so. There is, next to the playground, that painted area between that and the school. We'd certainly, you know, key stakeholders in this plan would be the principals and the staff in the building. to determine if the Gaga pit is outside of the playground there, would that should be included in the space? All of that would have to be discussed and make sure that they have the proper space that they need for dismissal and arrival and fire drills and all that stuff as well.

[Chair Roberta Cameron]: Cool. I have a question then. Given how tight the spaces are for some of these playgrounds, whether the LAN could incorporate a look at any other needs that might be able to be met in the same space with the playground such as we saw at Berry Park providing drainage, stormwater management for the surrounding neighborhood could be incorporated into the playground there. So I wonder whether there's an opportunity to look at engineering or infrastructure as part of the playground design so that we end up with the same amount of playground, but it's doing double the work.

[Kenneth Lord]: So all of the projects now are required to go through DPW review for that sort of thing. So for instance, at the Roberts, we just needed, we had to repair a doorway that the land was pitched the wrong way and the water was running into the door and causing it to rust out. I had to run that project through DPW and they designed the drainage pot portion for us and made sure that it was meeting the needs for that one small spot. So we could absolutely do that, involve them and the designer in making sure that we are improving drainage in the area certainly and not making it worse certainly. These all the current playgrounds are the important place systems which are you know they do drain out they don't they're not asphalt systems though.

[Chair Roberta Cameron]: Another question is whether you have a sense of the priority recalling that it was sort of a Hail Mary to be able to fund the McGlynn playground and pull together the funding that was needed for that in the span of two fiscal years. And so I anticipate that although that was much larger than any of these three playgrounds, the likelihood of being able to do all three of them in the same cycle is not. So do you have a sense of what the order of priority is or what would drive your choosing how to face the construction of the three playgrounds.

[Kenneth Lord]: Certainly. We don't have an existing priority in place right now. We have not picked one over another. I would think that we would work with the district to determine which one, because our goal is really about accessibility and about special education programs, we would probably focus on the school with the most programs and the most students of that direction. And that would probably make the priority choice for us. The funding sources are something I need to work with the school committee and the administration on where that funding would come from. These are also competing with many other projects that we have on the plate for and all the other building products that we have going on as well. So I'm not. not hopeful that we do all three at the same time. All three elementary schools are also currently in the MSBA accelerated repair program for new roofs and HVAC. In fact, tomorrow the first one, the Roberts, goes before the MSBA for approval. That would be a two-year project, probably 22 million dollars to replace the roof of the HVAC, do accessibility upgrades within the building, and that will probably replicate it at the Brooks and the Missituk there about four or five months apart as far as where they are in the staging process going through the MSBA. So we have to factor in the work at the playground with being those projects when those buildings are under heavy construction in the summers may also be an opportunity to do the project at the same time when no one's able to really be in the building in the spot because we're under construction with cranes doing roofs and stuff like that.

[Page Buldini]: Can I ask a follow-up question? Sure. Could I ask a follow-up question in regards to the Mississauga, and I know it's still in discussion and obviously would go before the MSBA, but I know there was discussion about geothermal and that HVAC system. Would that change first off the playground setup, and you might not be able to speak on that and or that timeline too.

[Kenneth Lord]: Sure, so I can actually do that. So we've each of the 3 projects are looking at different HVAC options, whether it's air source, geothermal or hybrid system. The Roberts chose an air source system where there's rooftop equipment that extracts the heat from the air and is able to cool or heat the building with that source. The Misatoch with the adjacent Columbus Park has the opportunity to do geothermal where the geothermal wells would be potentially, we have to seek approval for all this still, be in the Columbus Park, underground wells that we drilled and then piped into the building. It would not cut across the playground from what we're looking at and would not impact the playground use itself. There's just not enough space in the playground to drill the number of wells necessary to support the building size. The phasing of that, should everything be approved, funding, MSBA, the whole nine yards, we've got many steps to go through before we hit that, would likely be a summer 28, summer 29 project with work in between those two summers to do that. The first year of the project or the first summer of the project is mostly enabling roof work, things like that. The second summer would be the rooftop units and in between they do the geothermal wells around the busy schedules for when the field's in use, and then the fields have to be restored completely. Once that geothermal system is installed, you really wouldn't know it's there because the wells are all four feet below ground and they go hundreds of feet below that.

[Suzanne Galusi]: Any other questions about the schools?

[Chair Roberta Cameron]: I'm not sure. I'm not sure how whether your timer was meant to cover both projects. No. Okay. Yeah, move on to the Curtis tough school.

[Kenneth Lord]: So the Curtis Tufts School is our therapeutic day school. It's located on Main Street. There's about 20 students currently in the school. And the school was built in 1939, and it needs some work, obviously. So the most pressing problem are the front stairs, the roof, and the cupola. They're in need of renovation replacements. And because the age of the building and is designated as a historic building, we want to make sure that these changes are made in concert with what is in appropriately made. So they're historic appropriately. That didn't make sense, but I think you know what I meant. So what we'll be looking to do is to hire an architect to do plan documents for bidding and estimation to renovate the front stairs, rebuild the cupola, replace the fascia panels around the gutters and the roof of the building. There's multiple leaks in the roof presently. The front stairs are often complained about it being unsafe. They're steep.

slippery, they're not very safe to go up and down, and we want to be able to address those. Most of the leaking is coming through the cupola at the top. It really needs to be rebuilt completely. The front stairs, as you can see in the picture on the right, is really the Granite's heaved and twisted in different places. It ices up because it's pitched in the wrong direction, so it collects water. The fascia panels going around are rotted and need to be replaced. The gutters, some of them are missing. It all needs to be painted and repaired. I did contact, we have an architect on what they call the house doctor contracts with the city.

And he did an estimate of it would cost about $40,000 to come up with this design, ensuring that code compliance is met and that it's architect historically correct to do this, to send this out to a bid for this project.

[Chair Roberta Cameron]: Okay, appreciate that approach. Are there questions among committee members?

[Doug Carr]: Sure, I'll start. Ken, is the architect doctor, as you said, is that a preservation architect who's worked on other historic properties in the city like Chevalier and other ones?

[Kenneth Lord]: So I don't believe he specifically has, but he would bring in someone underneath him to do that work. So the architect we were thinking of using is Habib Associates. They've done quite a bit of work for the city. They've done our facilities condition assessment reports. They've done other reports. But he's a generalized architect that would then bring in historic consultants to be able to make sure they address those issues.

[Doug Carr]: I guess I haven't seen that before for these smaller projects, but I guess I'm more used to the upshore preservation architects just because they know the rules. They know the guidelines that we have to follow for the security interiors. They know that if it's copper, if it was copper, it needs to be copper. There's certain things that have to go with that, so I guess I would ask you to think about that because I think you might be duplicating work. You know, you need to bring up essentially a preservation consultant who does the drawings. It's like, I think it might be better just to, I mean, we've had so many good ones in the last 10 years here for various historic buildings, Grace Church down by, in the square that I was down, the Parsonage building down here, Chevalier, You know, they're not the same architects, but they all live in the same kind of historic preservation world, day in, day out. So it might be a better use of the funds for that.

[Kenneth Lord]: I would be absolutely open to that. We went to Habib just to get some estimation of costs, because we use them so frequently. He's a very collaborative person to work with. So absolutely, if you have names of some ones we can look at, we could absolutely look at that.

[Doug Carr]: I think Teresa probably has a bunch of them. Yeah. I can send those over. No problem. All right. No other questions.

[Vice Chair Joan Cyr]: So I'll just follow that to say that CPA funds can only be used for, you know, extraordinary repairs to historic resources. We're not a maintenance shop. We can't do maintenance. So if you bring in an architectural firm that has historic preservation as their bread and butter, that's the way you want to go because we don't do maintenance. We do capital improvements and extraordinary repairs to historic resources.

[Chair Roberta Cameron]: and I'm happy to see that you're applying for a, um. To study what we need to do to restore the cupola just because I know only a couple of years ago, the town of Arlington actually had to dismantle the people on their town hall because it got to a state of such Hoping that we don't get to that stage and in Bedford and I hope that we're able to support this project going forward my show.

[Myisha Majumder]: Hi, yeah, I have. perhaps an ignorant question, so please bear with me. But I thought I had read that the new high school plan involved moving the program. So I assume that we'll still be repurposing the school, but I'm just curious how that works with this process.

[Kenneth Lord]: So, I actually said on the high school high school renovation committee, so the Curtis tough population is slated to move to the high school as part of the project as well as some pre K classrooms. They probably wouldn't move to that building to around 2033. At the end of the project, it's the final end of the project, but the building is also already used by other people. So, every summer, it's used by their park and rec department. They hold their summer camp next door at the pool. They use the building. There's already the mayor's looking into other purposes for the building. Everybody's fighting over what they'll use it for, because it's space once we leave. But it will be a number of years before the Curtis Tufts staff would be able to move. And it's a city resource that still needs to be maintained and kept up. That's certainly not going to knock it down, I would think. OK.

[Myisha Majumder]: Sounds good.

[Doug Carr]: Thank you. Another question. Ken, do you know if there's any accessible historic photos or original drawings of the 1939 uh, building.

[Kenneth Lord]: I have not seen any. Um, in fact, when we were doing, um, so the mayor in the city, uh, so he's probably doing some studies of what it would take to renovate the inside of the building for other purposes. And we weren't able to locate any in our archives. I don't have any, and the city did not appear to have any as well. So that would be something we would need to research as part of this project. So I mean, the cupola is there, so we have the exact one that we need to match, but whether or not there are other pictures of the front stairs or things like that that we would need would be something we want to do as part of this project. I did not contact the Historic Commission to see if they had anything.

[Doug Carr]: I would just defer to Brian Hayward on that, who is the living encyclopedia of historic buildings in the city of Medford. So we can ask him if it exists, he would know about it. Perfect.

[Suzanne Galusi]: Other questions?

[Chair Roberta Cameron]: Thank you so much for your presentations this evening.

[Kenneth Lord]: Appreciate your time and please feel free to reach out if you have any more information. I will confirm that funding numbers for the playground things.

[Suzanne Galusi]: Awesome, thank you very much. Bye bye.

[Chair Roberta Cameron]: Alright. So that concludes our presentations for the FY 27 we do have an off cycle small grant application or not off cycle. It is a small grant application from the Unitarian Universalist Church rectory roof restoration. And Teresa, you let me know that you would be prepared to talk about that.

[Community Preservation Manager Theresa Dupont]: So yes, I'm just pulling up some visuals. I apologize. I should have had them already queued up, but here we go. All right, so our friends at the Unitarian Universalist Church have come back to us with a request. They have a very proactive approach to their restoration and preservation of the building, both the church as well as the Osgoode House, which is under their care and stewardship as well. Let me just hit share so everybody can see what I'm looking at too.

So to that end, again, they're very proactive about checking things out, and their contractor noticed that there's a bit of a gap in their slate roof. So it's currently kind of exposing a little bit of the roof deck. I have some photos I can share with you, and it's causing some water inundation issues. They're looking at it as an urgent repair, because it's actively allowing water to come into their building, and they want to get it repaired before the winter really hits us. So I believe the total project cost was $17,640. As this is coming in under our small grant application, just to remind everybody, it is maximum of $10,000 for projects up to $20,000.

If this body so chooses to give 17 and change that's on, but that is the ask tonight. They are fundraising for the additional funds that they need to finish the project. They are hopeful that they'll be able to raise that capital. All right, so the current conditions, again, it is the original historic slate roof of the building. We don't see very many of these for reasons that we can see, you know, it's a very rigid product. that has no room for error. So as you can see here, this is one of the areas that's currently exposed. You can see that some on the left here, you can see how some of the slate has fallen off and is coming loose. This is close up of two other areas where there's just, you can see right here on the left that there is actual plywood there. So that is the roof deck. On the other side of that wood is maybe some some two by stock and then drywall. So it's something that they would like to address sooner rather than later before it becomes an even more compounded issue.

So again, happy to try to address any questions that they may have. I believe that the approach to this would be to peel up a few of the slate tiles and to put rubber roofing surface underneath where there's certainly some inundation to kind of restore and patch and repair this specific areas of the building, of the roof.

[Suzanne Galusi]: Okay, questions?

[Chair Roberta Cameron]: So I don't, I wish that I, that we had a historic preservation professional in the room here who could tell us how feasible is it seeing those pictures of the roof to undertake this patch and repair approach? Is that going to solve their problem?

[Doug Carr]: I'm actually not sure because I'm, I was actually, I was kind of looking for a roof plan, you know, but I know this came together quickly and it wasn't the, I thought when we did earlier projects on this, I thought they had like elevations and plans and I thought they had everything. Like, it would make it easier to understand kind of the context, you know. You know, if the roof is leaking now, I would just literally put a tarp over it and just tape it down, you know, until we can actually get the repairs done. You know, it's literally leaking today.

[Community Preservation Manager Theresa Dupont]: And I believe that they have done some sort of temporary measure that they don't anticipate will withstand the winter. So it's not like it's still exposed right now, but if it's, you know, novocaine.

[Doug Carr]: I'm trying to think, you know, we did the slate roof for the Brooks Estate at two phases back in 99 and two years later. And, you know, they took it all off, put new copper down on the ridges and put, I think, ice and water shield over a new plywood. It was self-sealing. So like it was, and it hasn't leaked for 25 years. But I don't really know what's under there. And to Roberta's point, this wants to be a little bit more than a Band-Aid. I just can't tell them what this is, whether it's a Band-Aid. But the need is there. Just think we need to kind of, it's not a lot of money either.

[Community Preservation Manager Theresa Dupont]: I'll expand on the proposal that was provided to us. Why did I just do that? Make it harder for me to read. So they're going to remove all of the slate tiles, put in new roof decking, new plywood sheets in this one area. They're going to remove them all, put in a new deck, place the rubber roofing and seam tape. as well as metal flashing. So that's kind of like the ice and water shield that you were just talking about.

[Doug Carr]: But I think there's something between the slates and the new deck, right? They're not just putting the slates back on the deck.

[Community Preservation Manager Theresa Dupont]: Right, they're putting down a rubber roof surface and then the slates go on top of that.

[Doug Carr]: I'm not sure the rubber roof is the right solution. Just because it's not intended. Slate roofs need to be essentially nailed down, flagged, termite, whatever the tax attachment is. Again, nailed to a rubber roof. You need something that's self-sealing. So it's just a detail, that's all. But I don't think it's rubber. I don't think that's the right sequence. That is the proposed treatment. So we might have to tweak that a little bit. But it won't change. It won't change if we go within $10,000. It won't change anything.

You know, just by doing a swath of materials. I can actually look at the old details and see what we used before.

[Chair Roberta Cameron]: I want to recognize Losa.

[Losa Julie Genevieve]: Thank you. Doug kind of dig into some of the things I was going to mention regarding the rubber, because you can't puncture a hole into a rubber, then you're going to create more access for water to go. And at the same time, is there a possibility that they can't, because once water get into a roof inside, it seeps into the woods and it spreads. Sometimes when you think it's one area, because my family is dealing with this right now. So if you think it's in one area, but it kind of spread because the wood is soaking the water, it expands different places. So you might think the problem is just one right here. And what happened later on, like maybe six months later, you figure out there's more damage that was done.

[Community Preservation Manager Theresa Dupont]: That's a good point. Yeah, water likes to chase. the joists and whatnot.

[Chair Roberta Cameron]: So it seems the request would be for us to make an expedited decision this evening because it's a small grant application for an urgent project. And I don't know if we'd be comfortable making a vote on that this evening or if we'd really like to not only talk with the folks at Unitarian Church, but perhaps also their contractor to understand better how they scoped the project to make sure that what they're proposing to do is sufficient and is the right approach for this work. Sure.

[Community Preservation Manager Theresa Dupont]: I think that's a fair ask. for them just to reevaluate, ensure that this is the best treatment. We could always take this back up again in two weeks when we meet again on November 10th.

[Chair Roberta Cameron]: In the past, when we've received a request for funding for a roof, we told them, come back and ask us for a better project. And I would love to say the same to these folks, but I understand that we already have a very full slate, like where our funding is already over subscribed for this year. So the promise of funding a better project, I think isn't necessarily realistic and it'd be kind of late in the game to invite an off cycle application and put that alongside the projects that are already in the pipeline.

[Community Preservation Manager Theresa Dupont]: So just to, so I understand you're proposing what you're suggesting is maybe they come back and ask for a total roof restoration.

[Chair Roberta Cameron]: I mean, I feel like a total roof restoration would be a next year ask because I didn't see that we could do that this year. But if their contractor could explain how a patch this year would be like complement a full roof next year that or would help them to buy time and not be, you know, a redundant project. That would be helpful for us to understand better. Okay.

[Reggie Graham]: 16 by 14. the damage was being caused. All these things probably have to be addressed before we even think about whether it's a partial, we put a patch, or we even consider, because they're going to want to replace it with slate. They're not going to want to replace it with anything else.

[Community Preservation Manager Theresa Dupont]: They're going to want them to replace it.

[Reggie Graham]: I think they'll be required. Yeah. At the end of the day, I'd still like to know how much 16 by 14 is It's back there, so you know, that's not, that's not, it's a good size leak, if you will. But, you know.

[Suzanne Galusi]: I think that's fair. Yeah.

[Chair Roberta Cameron]: So, like, how did they determine that that was the area that needed work right now? The entire roof is 100 years old. At least.

[Doug Carr]: This building is very old, but the slate roof, this is the original slate?

[Community Preservation Manager Theresa Dupont]: That's what my understanding was, yes. I can confirm that. Yeah.

[Chair Roberta Cameron]: The condition of the slate in the photos would lead me to think that it needs more than that.

[Page Buldini]: Would there be damage to it?

[Doug Carr]: Yeah. Construction is, this is a contract, not a restoration, it's construction. repairs, it's just, you know, yellow glue and rubber roof and I just don't think this is going to... This is the same contractor who did their exterior work and installed the gutters on the Osgoode house.

[Suzanne Galusi]: Correct.

[Community Preservation Manager Theresa Dupont]: Yeah. Okay, so I'm hearing that we want to go back to the Unitarian folks as well as their contractor and explain how a patch this year will complement a full restoration next year. How is this specific treatment and area determined? Would we want to welcome them then back at the November 10th meeting to address those with us as well as potentially then take a vote? Okay. Well, you know, to your point, Doug, like they can take down a park as a very, very temporary, not permanent solution at all.

[Doug Carr]: I'm not. It looks like there's an asphalt roof, like partially under the slate and also flat, which is not the right roof like this. The flat roof doesn't appear to be the right material.

[Chair Roberta Cameron]: Was that part of the building added on?

[Doug Carr]: It might be.

[Community Preservation Manager Theresa Dupont]: I mean, that's why it's a regional house, but a separate structure. I think it used to serve as the directory.

[Doug Carr]: Yeah, just we just need to step back a little bit. I can see the bigger picture. But there's a project here for sure.

[Unidentified]: Yeah.

[Community Preservation Manager Theresa Dupont]: And who knows, they might be very excited to hear that we might support a full blown project.

[Doug Carr]: Well, Teresa, you said that some people might be dropping off. So is it is it as, uh, fortunately, they're not the big dollars. But, uh,

[Community Preservation Manager Theresa Dupont]: Yeah, it's big dogs. We'll be freeing up a wee bit of money. I keep saying wee. It's like the word of the day. Okay, thank you on behalf of the Unitarian Universalist Church of Medford. I appreciate y'all's dialogue.

[Doug Carr]: I love how you can win if somebody has to lose it.

[Chair Roberta Cameron]: And one more thing I see on the agenda is... Quick things. Yeah, some quick things. Medford Recreation Department transfer funds request to the Condon Shell Lighting Project from Tufts Park Field Lighting Project. I actually would prefer to, can we punt this for another month too? Is this time?

[Community Preservation Manager Theresa Dupont]: It is time sensitive. We did speak on it at the last meeting that you were not at. Director Bailey, Kevin Bailey came and spoke to the commission. It is dictated by a bid result that came back. So they are in need of those It doesn't necessarily have to come from us.

[Chair Roberta Cameron]: My concern is that procedurally, these are two completely different projects.

[Vice Chair Joan Cyr]: That's what we said last week.

[Chair Roberta Cameron]: And I would like to see them canceled, like, to close out the project that came in under budget and apply for an off-cycle application for a new project. Can you repeat that first part of what you said? Under budget? They should close out the project that came in under budget.

[Community Preservation Manager Theresa Dupont]: There is no... I thought there was... They want to take money from the Tufts Field Lighting project that we funded at the end of last fiscal year. Has not started yet. Okay. Okay. So it's money that hasn't been touched, actualized, anything like that. It's just a concept at this point that we approved. Whereas the Condon Shell one, they put a bid out And they want to take action on that bid and start this project in the spring. However, they need $50,000. So his ask was, could we take it from the Tufts Field Lighting Project, which is still a lighting project, and then transfer it to the Condon Show Lighting Project, which is still under the same department, different locations. It was less lighting of Tufts, but is that what they were the compromise? That would be the compromise. Yes. He was fully aware that he would need additional money to finish the Tufts project, but he did share that there are some planned construction projects, which is a fear of ours. When we were talking about this project last year, um, that may delay the Tufts field lighting improvement project because of other construction projects at Tufts. So that project is going to be on hold. for at least another two fiscal years. Okay.

[Chair Roberta Cameron]: I think I was reading a wrong version of the document. So this is a little bit off the mark, but let me hear Jeremy.

[Jeremy Martin]: Well, I think I'm going to say the same thing as you, Roberta. The letter that we have from Kevin talks about moving money from the rights pond dock project. So I guess if we even want to consider this, getting some clear documentation there is probably good.

[Community Preservation Manager Theresa Dupont]: to add some clarification on the Rights Pond Dock project. That was something that was submitted to us as an eligibility form. They did not move forward with an application this round. So I think he was just calling out that. He was just saying, I'm not gonna ask for this money, so can you give me that money? So I think it's just, he's supporting that, yeah, just essentially that they're not moving forward with a $75,000 ask. So I think he was wondering if maybe we could slide that in He's trying all avenues to try and attain that money from.

[Jeremy Martin]: Just a little confusing.

[Chair Roberta Cameron]: Remind me how much money he's looking for for the, it's about 47,000 and change.

[Community Preservation Manager Theresa Dupont]: The request was, you know, I can find out exactly what it's 47, 536, 75. Did we put the 75 cents in there? Yes, you did. Love it. So just to make the conversation easier, we're saying 50,000. So 50,000.

[Vice Chair Joan Cyr]: So he's saying that they thought they could retain existing lighting poles and footings, but their architect said that's not feasible. So now they want more money because they said it's not feasible to keep the existing light poles.

[Community Preservation Manager Theresa Dupont]: Yeah, apparently the lighting fixtures that are at Condon show the proximity to the river there is just causing them to have to put beefier, bigger structural footings in because what is there might not be the most structurally sound right now, so.

[Reggie Graham]: So procedurally, is this something that we usually do?

[Chair Roberta Cameron]: No. This is unprecedented. Unprecedented. So what we're asking to do, like maybe if we break it apart a little bit, because what's not unprecedented came to us from the Brooks Estate back in the days when we were phasing elements of construction. Um, that was one project. Yeah, that was one project. And what we're asking what they're asking for is a change in scope for the Tufts project. So we would put money back into the account by reducing the scope of the Tufts project. by 50,000. I don't know if he identified specifically what we're cutting out by removing 50,000 from that budget.

[Community Preservation Manager Theresa Dupont]: I think it would just be a funding reduction overall. It's not anything specifically because they haven't really put that project out to bid yet. So there's not a full scope for the Tufts lighting project where he could share and pick like, oh, well, just instead of five lights, we'll go down to four. It's just an overall budget reduction instead of us giving them $436,000 last year. Now it will be $386,000 if my math is good. And then they're going to come back next year and ask us for money to put back into that. I do want to recognize Reg is raising his hand, but I feel strongly that that would be like two fiscal years from now request. At that point, that pricing is three fiscal years from now.

[Reggie Graham]: you know, I'm all about parks and recreation and open space, but that 400 and somewhat thousand dollars for the lights, as you indicated, you know, it was going to be maybe included in the park restoration that hasn't been.

[Community Preservation Manager Theresa Dupont]: There are some ongoing, I mean, we'll actually hear about it at November 10th for a Tufts construction project that would impact

[Reggie Graham]: And so subsequently, I'm just talking about procedure. Yeah. Wouldn't they have to withdraw the lights if they were going to include it in the actual projects?

[Community Preservation Manager Theresa Dupont]: So yeah, I think it's two different projects that are just.

[SPEAKER_14]: So they could add. Two different projects. So they could add.

[Reggie Graham]: It shouldn't be. It shouldn't be two different projects because the lights are directly affected by the project field. Right, so I'm just saying, and you know what that would be.

[Community Preservation Manager Theresa Dupont]: Yes, I was gonna say maybe that's a great question to bring up at the November 10 meeting when we have them here to talk about because they're gonna be coming to us asking for an ungodly number of dollars to do this stormwater mitigation project so I see that being a nice conversation piece about okay well hi we funded this project last year. How can that dovetail in with this or maybe do some cost savings?

[Page Buldini]: It's kind of nice that there are multiple projects being talked about at the same time. Grandin already funded, well, one is, but yeah.

[Reggie Graham]: Yeah, but you know, I wasn't here for the lighting vote. Sure. I know you weren't. Thanks, y'all.

[Chair Roberta Cameron]: I feel like procedurally what we need is for them to request, formally request, a reduction in their grant. It sounds as though we can't even talk about scope right now because the project is delayed until some time in the future. So they've essentially banked $400,000 toward the future renovation of Tufts Field, specifically earmarking lighting when they get to that. But they're not there yet. So they're asking to reduce that bank to 300 some thousand dollars so that they have.

[Vice Chair Joan Cyr]: Because they don't need the money, but because they want the money now for this other project. For this other project. Very similar to when Amanda came to us for Riverside Park, when she originally came to us for those shades and then the price went crazy and she came back and said, I'd like to amend my application and request this additional funding to address these issues?

[Community Preservation Manager Theresa Dupont]: I believe she did submit a separate application. Yeah.

[Vice Chair Joan Cyr]: Why aren't we following the same process?

[Community Preservation Manager Theresa Dupont]: Yeah, I mean, we certainly did. This was a request that came through just because it was so urgent. We're exploring a thing that we've never really untangled before.

[Vice Chair Joan Cyr]: Virginia, because he's got a contractor ready to go? Is that the urgency?

[Community Preservation Manager Theresa Dupont]: For the condom shell lighting, we can't technically award the contract to the highest bid that we received until funding is secured. The lowest bid. The lowest bid, sorry. It's been a day. So right now, we have a winning bid, which was the lowest bid in hand, but we can't award a contract until they have all the funding secured. This was an avenue that Director Bailey was trying to explore to see if this is an avenue to get the funds.

[Doug Carr]: So let me say this. I feel I want to be helpful here, but I think what I'm hearing from you, Roberta, is this the attitude is this is a bank of money they can draw upon and do what they want. You kind of don't like that. And I understand why you don't like that, because it's not really their money. You know, it's it's the CPC's money that has been awarded. I think that's part of the The friction. Yeah.

[Chair Roberta Cameron]: Absolutely. This isn't a slush fund. This is money that's being paid for specific projects. And approved by the city council. Yeah, approved by the city council. We're trying to use it in the best way possible. I can understand the need for flexibility of our understanding that our understanding of the needs changes over time, so we have to come up with procedure that allows for flexibility, but also transparency and firmness of what, who the money belongs to and what it's for. You had a question.

[Page Buldini]: Thank you for everybody. Is there a typical window in which the money needs to be used? I know there's flexibility, but is that criteria on the application?

[Community Preservation Manager Theresa Dupont]: It's on our grant agreement that it's three years.

[Chair Roberta Cameron]: So from the point that they are three years, or we need to have a conversation about it. There is it's possible to extend it after three years, but then we need to talk about changes. Yeah.

[Page Buldini]: Okay. Thank you.

[Losa Julie Genevieve]: Yeah, thank you. When they were awarded that money, they had to go to city council. do they have to go back to city council to approve the change of the exchange of removing from one hand to the next?

[Chair Roberta Cameron]: Yeah, no, I think so. I think that the route to be able to do this, and it's unfortunate that I wasn't here last week, last month, and this is dragging on because I know that there's a window of time in which that bid is good from the contractor. But I think the path would be for them to formally request a reduction in the grant for the lighting. And at the same time, submit an application, an off-cycle application for funding for the convent shell to expand the budget for that project. And it's understandable that like, we can anticipate that the cost of Tufts Park renovation overall is going to be more than we can find in any one fiscal year. So banking this large amount for that project in the future, I don't think that's a problem. But I think that the process for taking money out of the bank has to be done this way.

[Doug Carr]: You're setting a good precedent.

[Chair Roberta Cameron]: Yeah.

[Doug Carr]: I think they can do this actually in two weeks. Like it's not an impossible task to, to provide the branch applicant the request and to put a new one in. It's just a couple of days worth of work.

[Community Preservation Manager Theresa Dupont]: Yeah. It's more so, um, we have to legally, we have to take action within 45 days of closing a bid. Okay. Procurement law. So that's really precipitating. What day are we at now? That I'm not certain on. The fact that he came to me about three weeks ago at this point, I would say that we're about halfway through. Shouldn't that be legally extended? That I'm not sure on, but I can certainly ask.

[Reggie Graham]: Are we moving forward?

[Community Preservation Manager Theresa Dupont]: We are. So I think we can probably put together an application. If we can get it all. But then it would be submitted to city council.

[Doug Carr]: Yeah, then I can vote on it within a week or a year.

[Community Preservation Manager Theresa Dupont]: Well, actually, I'm looking at the council agenda. We're meeting the same day as city council and then they're meeting on the 17th, largely due to the Thanksgiving holiday. So it's, we might be able to like eat this in on like day 45 or something.

[Chair Roberta Cameron]: And if we let city council know in advance that this is coming, they might be amenable to it, like understand the urgency to rush it through. Yeah. I would give them a heads up what we're trying to do. So. I'd give everybody a heads up so that everybody's.

[Reggie Graham]: Since we're, since we're the originators of the offering of the monies, I would think that we would want to be firm in our determination as to who would give them the money to run why and whatnot. And so we're clawing it back from them and they said, well, they don't have any questions. Yeah. Yeah. Yeah, that's exactly.

[Chair Roberta Cameron]: Exactly right.

[Losa Julie Genevieve]: Yeah, I agree. But at the same time, we just have to make sure they know that, okay, this money is there. Every time they want something, you're going to keep going back and try to take some, take some moving from here. Like you say, Roberta, it's not their money. It's our money. So therefore that. You can't use it as a cash, a cash cow.

[Vice Chair Joan Cyr]: For a specific reason, and they can't take that money and go over here.

[Community Preservation Manager Theresa Dupont]: Yeah, I think it was. A question worthy of being asked, like I said, it's unprecedented here. So I'm glad we talked about it. We've established something going forward. Just so I can confirm so I can reach out to Kevin tomorrow. we want to ask him to submit two things. One, a formal reduction of the Tufts field blading budget to reflect the difference in what he's requesting, as well as an off-cycle application for that amount that we will consider at the November 10th meeting.

[Chair Roberta Cameron]: Yes. And then we can make a recommendation to city council for both of those things. And it'll be a new, like the recommendation letter for the reduction is something that we'll be inventing the time, which is, I think, an acknowledgement that we gave this grant originally. The project has not begun construction yet and recognizing an urgent need. The recreation department is requesting to reduce that funding for the future project. so that they can ask for funding for this current project.

[Suzanne Galusi]: Yeah.

[Community Preservation Manager Theresa Dupont]: It's entirely possible. And nobody should be offended that due to the timeline, he may say, thank you for this false exercise. I'll have to go find the money elsewhere. I don't know where else he would find it. But because of that 45 day, just everybody should be able to. I'm not sure where we are on that timeline.

[Unidentified]: Right.

[Community Preservation Manager Theresa Dupont]: So it's possible we won't hear from him at all. But I'll encourage those and help him out. November 10th. All right, thanks everybody for entertaining that. There is one more quick item and it's just the meeting minutes.

[Suzanne Galusi]: Meeting minutes.

[Vice Chair Joan Cyr]: I'll make a motion to accept the meeting minutes from September 8th, 2026. Second.

[Chair Roberta Cameron]: All right, I will call the roll. Jeremy?

[Jeremy Martin]: Yes.

[Chair Roberta Cameron]: Losa? Yes. Joan?

[Vice Chair Joan Cyr]: Yes.

[Chair Roberta Cameron]: Myesha? Yes. Paige? Yes. Doug? Yes. Rich? Yes. And myself abstain because I wasn't there.

[Ada Gunning]: I'm still here too. I'm saying yes. I'm back in the room with terrible lighting, so I turned off my video.

[Vice Chair Joan Cyr]: So we're back. Roberta, it says you were present. I was present. Oh, yes. I was there.

[Chair Roberta Cameron]: I'm sorry. I was in the left.

[Vice Chair Joan Cyr]: Yes. Aisha and Ari were not.

[Myisha Majumder]: Okay, sorry, I can send my yes, then.

[Vice Chair Joan Cyr]: You're only receiving the minutes and they are received confirmed.

[Chair Roberta Cameron]: So, nobody has to have seen you've received the minutes. So I'll take that as a unanimous. Everybody voted. Yes. Then we October 13th.

[Community Preservation Manager Theresa Dupont]: Many meeting minutes admittedly got in there quite late, but they were in the meeting packet happy to defer to next meeting, but I don't see them. Meet my life, I swear you hit refresh. I promise. I'm looking right now.

[Jeremy Martin]: I saw them in there.

[Vice Chair Joan Cyr]: Yeah, they just showed up. Motion to accept meeting minutes. I second.

[Chair Roberta Cameron]: Okay. All right. Let me call the roll. Jeremy.

[Unidentified]: Yes.

[Chair Roberta Cameron]: Yes. Proceed. Sorry. Everybody can vote. Please stop.

[Community Preservation Manager Theresa Dupont]: Yes. Yes. Page. Yes. Doug.

[Chair Roberta Cameron]: Yes.

[Doug Carr]: We have one more motion to make. Yes. Who wants to make it? I'll make a motion to adjourn.

[Vice Chair Joan Cyr]: Everyone.

[SPEAKER_18]: Losa? Yes. Joan? Yes.

[Myisha Majumder]: Maisha? Yes. Ada? Yes. Paige? Yeah. Doug?

[Unidentified]: Yes.

[Myisha Majumder]: Reg?

[Doug Carr]: Maisha, one last thing. Is there a UFO outside? Yeah, how is it? What's going on?

[Myisha Majumder]: Oh my god, it's my Halloween lights. Sorry.

[Doug Carr]: I thought I was seeing a replay of Close Encounters. Good night, everyone.

Page Buldini

total time: 2.4 minutes
total words: 440